
01

2012
Rather than completely excavating the floor, on this project it was decided to remove the existing floor covering and replace it with high-compressive strength insulation and the Ideal EPS system.

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21