The JUPITER system was specificed by John D Clarke architects of Eastbourne and installed in the Summer of 2012. The existing floor was a combination of different substrates, and were therefore dealt with using various solutions. Overall mechanical engineering was undertaken by Barry Goodman. Project construction was undertaken by Westridge Construction.