Skip to content

St. Mary’s Church, Handsworth

2019

This church floor renovation required a new, unlevel floor to be installed. This was achieved using our levelling slate. This was then followed with insulation, the Ideal EPS heating system and then the Screed Replacement Tile system. Completed in 2019.