Skip to content

St. Mary’s Church, Leatherhead

2019

JUPITER were initially approached by the client to assist with the design and installation of the underfloor heating system for this beautiful church in Leatherhead. Subsequently, the architects Thomas Ford & Partners engaged us to finalise a design that required a complete excavation of the existing floor, which was then replaced with foam glass aggregate and our dry-installed system above.