
01

2015
In 2015, JUPITER were specified by McLaren Murdoch and Hamilton Architects to install a new underfloor heating system. The new heating system was installed over an existing, un-insulated suspended floor.

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25